Things have changed again at Reapers of Hope
(Moorefield Building Project) New siding and new
roof glistens in the November sunshine,
as the existing building gets a
facelift. The roof on the existing building
has been replaced with a new metal
roof. The old siding was torn off, and
presently we are working on mounting
the new siding. New windows have
also been installed.
The exterior of the new building is basically
completed – roof and siding are on.
We Are Grateful or All the Volunteers
At the Moorefield Building Project!
Inside, all floors have been finished
in both buildings.
Again, thank you to all the volunteer
help we have been given with roof, siding,
and floors. In the next few months,
we anticipate a lot of interior work – insulation,
drywall, wiring, etc. We will
continue to need volunteer labour for
that. If you come with a group of 6 or
more, please Contact Us.